Monday 2 March 2020

2020-03-02 F1 Fuselage JIG III

The JIG is finally done!
Thanks to Selångers Lastmaskiner for sponsoring materials and
workshop equipment etc.
  At home in the garage!
Middle and rear section!
Front section!
Lower mounting hole för firewall!
Upper mounting hole for firewall!
 I had to create a (special Jig) for the Fuselage-Jigs´s front section.
 A 28 mm thick MDF board that is absolutely straight and smooth!
Firewall-holes measured for mounting cross bars!
Front section layout!
Ready for welding!
Upper cross-bar in position!
-
-
-
 The front is fully assembled and welded together!
Metal work!
More metal work!
 Installation of support legs!
 Careful settings before welding!
Spirit level in the middle!
-
-
 I also had to check with a digital level!
Aluminium triangle angle ruler!
-
-
 Soon finished!
 26.5"
Ready for transport home!

(The next post will be about the Tools i ordered!)


No comments:

Post a Comment